loading

Staxx Pallet Truck is a professional warehouse equipment manufacturer and pallet jack supplier in China.

Principles and steps for installing semi-electric stacker components

by:Staxx Pallet Truck     2023-02-04

In warehouse workshop operations, the application of semi-electric stackers has gradually become popular. When the bosses buy the semi-electric stacker from the storage forklift manufacturer, due to the consideration of transportation space and safety issues, it is often not a finished product, and some parts need to be installed by themselves. Then, the installation of the semi-electric stacker has become a very important issue. Next, follow us to understand the principles and steps of installing semi-electric stacker components.

The installation of semi-electric stackers usually follows the installation principles from bottom to top, from inside to outside, from back to front, and from left to right. Let's take a look at the specific steps:

1. Piston rings should be used as a whole set, and cannot be disassembled and assembled arbitrarily. The installation starts from the third ring.

2. Do not touch the piston, crankshaft surface, connecting rod, piston, crankshaft, and camshaft at will. When installing these parts, apply engine oil evenly for the purpose of protection and lubrication.

3. Apply butter to the O-ring as required, and then install the cylinder liner. Warehousing forklift manufacturers remind everyone not to hit the cylinder liner during installation.

Remember that the ring cannot be installed vertically or horizontally. When installing the opening of the ring, it must be staggered by at least 120°just right.

5. One more thing that the storage forklift manufacturer wants to tell everyone is that the cylinder head gasket can only be installed after the engine oil is applied, and the process is irreversible.

6. When installing the cylinder head screws, the storage forklift manufacturer should also remind everyone to pay attention. The wrench should be tightened from the middle to the four sides, and the screws of the cylinder head should be tightened 2-3 times to ensure that each screw is evenly stressed, and then from the middle to the two sides. Tighten the crankshaft connecting rod in 2-3 times.

7. Install the piston connecting rod in the original direction of the piston as required, use special tools to install the piston connecting rod, also do not knock the piston, and apply the engine oil evenly on the connecting rod tile.

Pay attention to the alignment of the gears when installing the gears and camshafts of the high-pressure fuel injection pump. Storage forklift manufacturers think this is very important.

The above are the principles and steps for storage forklift manufacturers to install semi-electric stacker components. I hope our content can be helpful to everyone.

Custom message
暂无友情链接数据
Chat Online 编辑模式下无法使用
Leave Your Message inputting...